Back to 3G.co.uk homepage3G phone reviews and the latest 3G phones here3G Forum for help and advice about all things 3GAll about 3G around the world - latest news and phones
Today's 3G News
3G offer of the month

This Weeks 3G News By Photos

3G Sponsored by AEROFLEX
Leading supplier of base station and mobile test equipment for GSM, EDGE, AMR, CDMA and 3G standards, including HSDPA and HSUPA.
MIPCOM MOBILE TV AWARDS
Submit your made-for-mobile TV content, formats, channels
PSE 3G Gateway
PSE 3G Gateway is an open-standard and protocols-compliant gateway to connect 3G UMTS and IP (H.323, SIP) networks.
NetClaw
With NetClaw®, everything you need is available in a single, portable unit – data capture, monitoring, and troubleshooting for new and existing services.
Test With The Best - Catapult
Catapult test solutions for Protocol Analysis – Protocol Monitoring –

Ofcom to Measure 3G Coverage in UK

31st July , 2006

Europe UK : Ofcom published the methodology that it proposes to use to determine the extent to which the 3G mobile network licensees – O2, Vodafone, H3G, T-Mobile and Orange – have complied with their obligation to roll out services. Under the terms of their licences, each is required to cover 80% of the UK population by 31 December 2007.

Ofcom’s proposed approach is intended to measure the availability of each licensee’s service which should, under normal circumstances, be able to provide a range of applications such as voice, text, video and multimedia services.

Ofcom’s methodology, which is subject to consultation, is as follows:

Ofcom will assess coverage on the basis of data about base stations supplied by the licensees and population data from the 2001 Census;
it will use planning tools to perform an engineering analysis of the signal strength receivable at outdoor locations; and
this will be supported by sample measurements around to the UK to verify the results.

Ofcom expects all licensees to meet the obligations in their licences, but it considers guidance on enforcement action is helpful to reduce regulatory uncertainty. The statement today follows a consultation in 2005 which attracted nine responses on this point. The content of the guidance is broadly unchanged from the consultation.

The proposed methodology is subject to consultation and can be found, along with Ofcom’s final guidance on the enforcement of rollout obligations in the Related Items.

The deadline for responses is 20 October 2006.

Click to see more about this offer.

If you would like our FREE daily 3G News delivered to your mailbox then please SUBSCRIBE ( click here )

Please ask your IT department to add the following domain http://www.3g.co.uk/ to their spamfilter as a good source so that your newsletter is not blocked in future.